Scenarios
You have fourteen things and your manager asks what's most
important. What would you do — say all of them are, which is true, or
force a ranking and tell them what will slip as a result?
Your calendar is booked solid all week and something urgent arrives.
What would you do — fit it into the evening, or find the thing already
scheduled that it should displace and say so?
You feel like meetings are destroying your week but haven't
measured. What would you do — start declining meetings, or track two
weeks first and find out whether meetings are actually the largest
block?
Takeaway
- Rank against each other, not against a standard. If everything is a
priority, you've made no decision and someone else will.
- Leave gaps on purpose. A plan with no slack fails on the first
eight-minute overrun.
- Say what will slip when you accept something new. Silent absorption
just moves the failure later and makes it yours.
- Measure a couple of weeks before redesigning your system. Your
impression of where the time goes is assembled from the memorable
parts.
- Accept that things will be dropped. Choosing which ones is the whole
job.